The Ras Al Khaimah casino forms part of Wynn Al Marjan Island on Al Marjan Island, but it was not open to the public on 10 August 2026. Wynn's most recent official guidance places the guest opening in September 2027.
This snapshot distinguishes finished milestones from planned work and gives a date for every time-sensitive figure. Opening and operating details may move, so each row follows the newest official reference available.
| Item | Confirmed status | Reference date |
|---|---|---|
| Resort status | Under construction and not open for visits | 10 August 2026 |
| Opening date | September 2027 | Wynn results, 4 August 2026 |
| Licence | Island 3 AMI FZ-LLC, trading as Wynn Al Marjan, is listed by GCGRA | Current GCGRA register |
| Tower | 70 floors, with a final planned height of 352 metres above sea level | Current resort website |
| Accommodation inventory | All 1,530 units structurally complete | 2 February 2026 |
| Gaming area | 225,000 sq ft, about 20,900 sqm | Wynn 2025 annual filing, March 2026 |
A construction site cannot be treated as an open hotel, restaurant or gaming floor. Wynn currently provides an email update form, but submitting it does not create a reservation or an admission ticket.
Wynn Al Marjan Island is Wynn's first integrated resort in the Middle East and North Africa, while its developers call it the UAE's first. The destination is planned to bring together a hotel, licensed gaming facility, dining, entertainment, retail, spa, beach, marina and events centre.
More than 60 hectares of Al Marjan Island in Ras Al Khaimah are included in the project, which faces the Arabian Gulf. Entities linked to Wynn Resorts, Marjan and RAK Hospitality Holding are involved in the joint venture, and the gaming licence register names Island 3 AMI FZ-LLC.
This is not merely a gaming floor beside a hotel. Published information has mainly covered accommodation, restaurants, beach facilities, events and entertainment, whereas Wynn has not yet released the detailed game mix.
In its second quarter results on 4 August 2026, Wynn said guests should be able to enter the resort in September 2027. This is the latest specific month, replacing pages that mention only 2027, the first quarter of 2027 or spring 2027.
Earlier investor updates pointed to the first quarter of 2027. Wynn warned of a modest delay in May 2026 and said it would provide the detail later; the August release then shifted current guidance to September 2027.
A company results release carries more weight than a property listing or travel blog, yet it remains forward-looking guidance while the resort is being fitted out. Check the official resort website and Wynn investor releases again before paying for a non-refundable journey.
Read the announcements in order to keep former targets separate from the current one. Together they trace the Ras Al Khaimah casino from an early proposal to a licensed facility under construction with a stated opening month.
| Date | Milestone | What it means |
|---|---|---|
| 25 January 2022 | Joint project announced for Al Marjan Island | The concept began with preliminary scope and timing |
| 4 October 2024 | Wynn announced receipt of the commercial gaming facility operator licence | The project became the UAE's first licensed commercial gaming facility |
| 25 November 2025 | A site ceremony marked the 70-floor hotel tower reaching its top | The main tower hit a visible construction milestone |
| December 2025 | Wynn's later updates recorded structural concrete completion | Work shifted further into the crown, facade and interior phases |
| 2 February 2026 | Facade reached 83%, all accommodation units were structurally complete and Wynn Bridge reached 48% | This remains the latest detailed construction percentage release |
| 11 March 2026 | Construction resumed after a short pause | This was a status update, not an opening or cancellation notice |
| 29 June 2026 | Wynn announced an original theatre production with Punchdrunk | The opening entertainment programme gained a confirmed headline show |
| 15 July 2026 | Wynn's investor presentation showed extensive interior work in progress | The latest visual snapshot confirmed the fit-out phase was active |
| 4 August 2026 | September 2027 was named for opening the doors | This is the current official date to use for planning |
A Wynn project story places the 70-floor ceremony on 25 November 2025, while later corporate updates place structural concrete completion in December 2025. The timeline keeps November for the site ceremony and December for the later construction record instead of combining the references.
Wynn reported on 2 February 2026 that structural concrete had reached the roof of level 71 and that 21,852 of 26,471 facade panels were installed, or 83%. Its guest website calls the tower 70 floors, so both descriptions are retained rather than converted into a new floor count. Wynn releases have used varying interim height measurements, while the stable published target remains 352 metres above sea level once the spire is fitted.
Elevator and escalator work was advancing, alongside mechanical, electrical and finishing work throughout the guest inventory. Concrete and structural steel work across the low-rise buildings had reached 99%, but that percentage does not mean the spaces are ready to receive guests.
The 548-metre Wynn Bridge is planned to link the resort via Wynn Boulevard with E311 and E611. On 2 February 2026 it was 48% complete, piling was finished, nine of ten bridge column pile caps were in place, and Wynn was targeting late 2026 completion.
Wynn's August results described rapid construction progress, and its second quarter presentation showed substantial interior work as at 15 July 2026. Since neither source gave a newer facade or bridge percentage, the February figures remain dated rather than being extended through estimation.
Wynn's 2025 annual report, filed in March 2026, gives the gaming area as 225,000 sq ft. That is about 20,900 sqm, and it is the figure used here because it comes from the latest direct corporate filing.
Older property and news coverage, including current search results, often quote an approximate 18,500 sqm gaming floor. Wynn has not explained whether the two figures cover different spaces, so 18,500 sqm remains an older estimate rather than being added to the newer number.
| Measure | Figure used | How to read it |
|---|---|---|
| Gaming area | 225,000 sq ft, about 20,900 sqm | Latest figure in Wynn's annual filing |
| Older figure still repeated online | About us 18,500 sqm | Legacy estimate, not the current lead figure |
| Development site | More than 60 hectares | The whole integrated resort, not only the gaming floor |
| Hotel tower | 70 floors | Current guest-facing description |
| Structure in the February update | 299 metres through the level 71 roof | A dated construction measurement, not final height |
| Planned height with spire | 352 metres above sea level | Final architectural target on the resort website |
A floor-area figure does not show how many tables or slots there will be, which games will be offered, or how space will be divided between general and private rooms. Wynn had not released those details by 10 August 2026, so a precise inventory requires a newer operator source.
Wynn's February construction update recorded all 1,530 accommodation units as structurally complete, although interior fit-out was continuing. The categories below include apartments, townhomes and estates within the total, so none are counted twice.
| Category | Number | Published description |
|---|---|---|
| Resort rooms | 1,217 | Rooms and suites in the main Resort Tower |
| Enclave suites | 297 | A hotel within a hotel on the upper floors |
| Royal Apartments | 2 | Two apartments at the top of the tower |
| Garden Townhomes | 4 | Standalone garden accommodation in the resort plan |
| Marina Estates | 10 | Residences beside the marina |
| Total | 1,530 | Current announced guest inventory |
Enclave is Wynn's hotel-within-a-hotel concept on the upper floors, served by its own entrance, arrival area and lifts. It is built around suite accommodation and a separate service setting, while rates, packages and the reservation opening date have not been announced.
Older Wynn releases used the 1,542 figure, which competitors still repeat. The February 2026 construction release and current resort materials offer a full category breakdown totaling 1,530, the figure used in this guide.
The current resort website lists plans for 22 restaurants, bars and lounges, as well as a daytime beach club for hotel guests and visitors. Wynn has announced a French-American steakhouse by Alain Ducasse and another Delilah supper club, but restaurant bookings were still closed at this update.
Wynn announced on 29 June 2026 that an original Punchdrunk production will launch with the resort. Once booking begins, guests are expected to select an upstairs seated performance or a roaming immersive route downstairs and backstage; show dates and prices remain unreleased.
The plans call for a naturally lit luxury shopping parterre, but Wynn has not issued the complete shop list. Art will appear across public areas and guest rooms, with announced highlights such as Jeff Koons' 11-metre Tulips and historic and contemporary works by regional and international artists.
Plans provide for 420 metres of private white-sand beach and a deep-water marina intended for broad yachts. A daytime beach club is also included, although day-pass terms and access for non-guests have not been published.
Wynn lists 12 pools with cabanas and landscaped surroundings, alongside a five-star spa, salon and fitness centre. Treatment prices, opening hours and pool-entry conditions are still unavailable, so they cannot yet be included in a dependable visit budget.
The official amenities list pairs a kids' club with outdoor recreation, indicating that families are part of the resort's non-gaming audience. Accepted ages, fees and supervision arrangements have not been released, so childcare plans should wait for the guest policy.
Coral Court is planned as the resort's centre for events and celebrations and has a published area of 7,708 sqm. It will include six reconfigurable meeting rooms, separate salons for brides and grooms, and private prayer rooms for men and women.
The Grand Ballroom measures 2,633 sqm, is column-free and looks over the marina. Its area helps organisers compare venues, but it does not determine capacity because tables, stages, aisles and production equipment alter the seating plan.
By 10 August 2026, Wynn had not released venue packages, prices or minimum spends. When sales begin, ask for a written capacity plan and a quote that covers production, catering, cancellation and accessibility rather than inferring attendance from floor area.
The resort sits on Al Marjan Island in Ras Al Khaimah rather than in Dubai. Wynn's website gives about 15 minutes by car from Ras Al Khaimah International Airport, while a 2025 Wynn financing release estimated roughly 50 minutes from Dubai International Airport.
| Starting point or route | Official information | Planning decision |
|---|---|---|
| Ras Al Khaimah International Airport | About us 15 minutes by car on the resort website | Review the journey time on arrival day because traffic changes |
| Dubai International Airport | About us 50 minutes in Wynn's 2025 release, with the resort under 50 miles away | Add baggage and traffic time rather than treating the estimate as a guarantee |
| Wynn Bridge | Planned link through Wynn Boulevard to E311 and E611 | Late 2026 was the completion target, so verify that the route is open |
| Resort shuttle | No operating timetable or fare published | Do not plan around a service the operator hasn't announced |
| Parking and valet | Final operating details not published | Review arrival instructions when reservations open |
The 548-metre bridge is intended to give the resort a more direct connection to the wider road network, yet the latest detailed release still described it as under construction. Treat it as closed until Wynn announces completion or a current mapping service confirms the route.
After bookings open, confirm the final drop-off point because the hotel, events centre and marina may have separate entrances. Leave time for delays, and do not pay for a transfer unless it appears in a written reservation confirmation.
In the GCGRA licensee register, Island 3 AMI FZ-LLC appears under land-based gaming facilities and trades as Wynn Al Marjan. Wynn announced on 4 October 2024 that this project entity had received the UAE's first commercial gaming facility operator licence.
The register shows that the named entity holds a GCGRA licence for this particular land-based facility. It lists The Game LLC separately as operator of the UAE Lottery, placing land-based facilities and lottery products in different licence categories. Wynn Al Marjan is set to become the Gulf Cooperation Council's first licensed casino when it opens; wider regulation is covered on our UAE gambling laws page.
Before players are welcomed, Wynn should publish the gaming floor's final age, identity, admission, responsible gaming and complaints arrangements. Rules from other Wynn properties do not transfer here until these conditions are published.
A resort's operating details can shift during the months before opening, making the unknowns as useful as the confirmed figures. The table keeps an email registration, design image or third-party offer from being mistaken for a booking or an operating commitment.
| Detail | Status on 10 August 2026 | What to do |
|---|---|---|
| Hotel bookings and room rates | Reservation date and prices not announced | Join official updates and wait for Wynn's booking engine |
| Restaurant reservations | Not open on Wynn's dining page | Do not pay an unverified intermediary for a table |
| Casino game list | Table, machine and title counts not published | Wait for the operator's gaming information |
| Betting limits | Minimum and maximum stakes not published | Do not substitute limits from Wynn Las Vegas |
| Age, ID and admission charges | Final Wynn conditions not published | Review Wynn and GCGRA before travelling |
| Dress code and opening hours | Not published | Review the guest guide when it appears |
| Shuttle, parking and valet | No operating timetable or pricing published | Request confirmation with the hotel booking |
| Theatre tickets | Interest registration available, schedule and prices incomplete | Do not treat registration as a ticket |
Wynn's website collects email addresses and areas of interest for news and early updates. It does not reserve a room, restaurant or theatre seat, and it fixes neither price nor priority without a separate booking confirmation.
Use the resort website first, compare the licence with the GCGRA register, and compare the opening date with Wynn's newest investor release. When an official channel omits a detail, record it as unannounced rather than borrowing another resort's policy.
This guide and its gaming content are intended for adults aged 18 and over. GCGRA advertising standards define underage as below 21 for commercial gaming other than lottery. Wynn had not released its final gaming-floor identity and admission policy by this update, so check it before travelling and do not assume hotel access covers every resort area.
As a purely illustrative example, imagine a future one-day entertainment budget of 800 United Arab Emirates dirhams (AED), not a Wynn price. Reserve AED 500 for transport, food and contingency, then set AED 300 as the absolute gaming limit whatever happens.
Choose the spending limit and finish time before entering the gaming area, and keep additional cards or funds outside the plan. Once either limit is reached, leave instead of moving contingency money into a new stake or chasing a loss.
Stop if gaming brings hidden spending, borrowing, anxiety, or neglect of work and relationships. Our responsible gambling guide covers warning signs, a stopping plan and support options in greater detail.
The answers below reflect official information available on 10 August 2026. Revisit the opening date and entry conditions when reservations begin, since operating details may change before then.
No. Construction is still under way, and Wynn said on 4 August 2026 that guests are expected to enter the resort in September 2027.
September 2027 is Wynn's latest official guidance. It appeared in the second quarter results released on 4 August 2026, replacing earlier references to the first quarter or spring of 2027.
Wynn Al Marjan is on Al Marjan Island in Ras Al Khaimah, rather than Dubai. Wynn places Ras Al Khaimah International Airport roughly 15 minutes away by car.
Wynn's newest annual filing gives 225,000 sq ft, or about 20,900 sqm. Older project coverage uses an approximate 18,500 sqm figure, so this guide follows the newer company filing.
The announced total is 1,530 accommodation units: 1,217 Resort rooms, 297 Enclave suites, two Royal Apartments, four Garden Townhomes and 10 Marina Estates.
The General Commercial Gaming Regulatory Authority, or GCGRA, granted the licence to Island 3 AMI FZ-LLC, trading as Wynn Al Marjan. Wynn announced the UAE's first commercial gaming facility operator licence on 4 October 2024.
By 10 August 2026, Wynn had not given a hotel reservation opening date, and its dining page still showed restaurant bookings as unavailable. An email-list registration is not a booking and promises neither a rate nor priority.
As of 10 August 2026, Wynn had released no table-game list, slot count or betting limits. Use the operator's future gaming information and entry terms instead of borrowing details from another Wynn resort.
Wynn estimates about 15 minutes by car from Ras Al Khaimah International Airport and previously gave about 50 minutes from Dubai International Airport. Traffic affects both estimates, while the February 2026 update still described Wynn Bridge as under construction.
GCGRA advertising standards treat anyone under 21 as underage for commercial gaming other than lottery. Wynn had not issued final gaming-floor ID and admission rules by 10 August 2026, so visitors should review Wynn and GCGRA terms before travelling.